Photograph Gallery


making better buildings

Photograph Gallery

A car has careered off the road and collided with the house. An assessment of the structural damage and extent of repair was made to support an insurance claim.
Wet rot found behind skirtings in damp basement
Dampness problems to the underside of an external staircase. Dampness was entering from outside but with no insulation to the concrete stairs condensation was also a factor.
Basement dampness in a victorian house due to a failure to adequately connect the waterproofing in the floor with the tanking of the walls
Survey of refurbished house: Bespoke window
Survey of refurbished house: New stone balustrade and cleaned brickwork. A high quality specification
Building Survey of country house in Kent: Unusual roof top room.
Building Survey: Chislehurst, Kent
Building Survey: Cambridgeshire
Building Survey: Forest Hill, London
Roof survey in Stepney, London from hydraulic platform
Building Survey: The Orangery, Eltham, London
Building Survey: The Orangery, Eltham, London. Carved keystone detail.
New School roof. The entire roof structure had to be replaced. New triple glazed rooflights illuminate the interior and high spec insulated roof system was provided.
Refurbished Food Technolgy Room
Wet Rot had affected the roof timbers of this listed Georgian house in Lewisham. All joists were spliced to the Structural Engineers details. The property remained occupied during the works.
Recovering flat roof in Blackheath, London: Before
Recovering flat roof in Blackheath, London: After
External envelope repairs in Greenwich, London: Before
External envelope repairs in Greenwich, London: Cracked brickwork to arch
External envelope repairs in Greenwich, London: Repaired arch
External envelope repairs in Greenwich, London: Cleaned brickwork
External envelope repairs in Greenwich, London: Works complete.
Refurbished School Reception Area with bespoke desk
This damp stain led to the discovery of a leak and a toxic mould outbreak under the floor. The mould was removed by specialist contractors. The timber flooring had to be replaced as a consequence.

Clive Edghill & Associates, 201 Greenwich High Rd, Greenwich, London SE10 8NB   
Tel: 020 8853 8383    e: [email protected]